Skip links

Blimp My Ride

About Blimp My Ride

This fun and colourful challenge sees teams use enormous helium balloons and a variety of resources to create their very own blimp that they will fly across the conference room.

This challenge requires design, creativity, construction, ingenuity and will finish with a sky of colour as the blimps set sail to discover, who is the winner of the Blimp my Ride Challenge?

Enquire Now

Location

Large indoor space

Duration

1 – 3 hours

Group Size

10 – 1000+

Blimp My Ride Team Building Pinnacle Team Events

Key Facts

Amazing Race Team Building Pinnacle Team Events

The Blimp My Ride team building event will see your delegates divided into teams of approximately 7 people per team.

Amazing Race Team Building Pinnacle Team Events

We require a large, cleared indoor space for this activity plus one table per team.

Amazing Race Team Building Pinnacle Team Events

The resources available to build the blimp includes cardboard, tape, string, weights, propellers, balloons, fans, paper clips, pens, paper and much more. It is up to the team to attach their resources aiming to transport their blimp from one side of the conference room to the other.

One Activity, Two Options

There are two options for how the Blimp My Ride activity can be facilitated:

Option One: 60 – 90 minutes
Teams are given equal equipment to build their Blimps, and the final flying challenge will test the overall success of the task.

Option Two: 2 – 3 hours
Teams must earn the resources to build their Blimp by successfully completing a series of team based tasks. The teams that successfully complete more tasks earn more resources to assist with their Blimp construction.

Example Team-Based Tasks for Option 2

Eddy the Egg

Teams construct a space capsule device out of straws and tape to catch a raw egg dropped from 2 metres.

Foil Towers

Teams race against the clock to build the tallest tower using only foil.

Squares

How many can you see?

Nailed It

It appears impossible however if you think outside the square you can balance 12 nails on just one nail head.

Blimp My Ride Team Building Pinnacle Team Events

Key Benefits

Amazing Race Team Building Pinnacle Team Events

Stimulating Creativity

Amazing Race Team Building Pinnacle Team Events

Collaboration

Amazing Race Team Building Pinnacle Team Events

Fun

Team Building Pinnacle Team Events

Communication

Team Building Pinnacle Team Events

Teamwork

Amazing Race Team Building Pinnacle Team Events

Problem Solving

Team Building Pinnacle Team Events

Lateral Thinking

Amazing Race Team Building Pinnacle Team Events

Friendly Competition

Team Building Pinnacle Team Events

Entertainment

Team Building Pinnacle Team Events

Energiser

Blimp My Ride Team Building Pinnacle Team Events

Inclusions

  • 1 – 3 hours
  • A Pinnacle host / MC & assistant Pinnacle facilitators to run the event
  • All facilitation and equipment required
  • $20 million Public Liability insurance
  • Gold Pinnacle medallions for the winning team

Frequently Asked Questions

This event requires a large indoor area. The size of the room required depends on the size of the group – feel free to contact us and we can advise what room size is required for your team. Ideally the room is set with 1 trestle table per team to be used during the construction stage. Additionally, the room will need a cleared floor space to fly the Blimps.

This event requires prior access to the room to inflate all the balloons and set each team’s table with construction materials to build the Blimp.